Welcome to Iightstrade.com!

Rain Spray Test Machine

MOQ :1 piece

Lead Time :20 Days

Seller Support : Trade Authenticity Guaranteed & Accepting

Payment : L/C,T/T,Credit Card,Western Union,Money Gram,Other

Departure Port : Shenzhen,Guangzhou,Shanghai,Ningbo

Product details

Supply Ability

  • Supply Ability:200 piecesWarranty(Year):1 Year

Packaging & Delivery

  • Length:160 cmWidth:137 cm
  • Height:296 cm
  • Packaging:1 piece

Product Specifications

Product Description

Application:

The test is applied to the products that may suffer from different temperature spraying water during shipping,storage or use time.The water comes from downpour,weather-beaten,water sprinkler system,wheel splash,flush filling or fierce waves conditions to test the performance index of products and for quality management use.

Major Specification:

1.imitate the rain spray test
2.Spray volume:2L/min
3.Spray method:swing pipe water spray method
4.Swing pipe dimension:180°half round swing pipe;swing pipe inner diameter: 16mm ; swing pipe radius:500mm
5.Spray swing pipe cycle:3~12S (adjustable)

6.Specimen Limitation:

1)inflammable material ,explosive material,easy to volatile material test sample are forbidden;

2)storage corrosive substances test sample is forbidden;

3)storage biological test is forbidden;

4)storage strong electromagnetic emission source for test sample or storage are forbidden

7.Rotary table load bearing:no more than 100kg

8.Flexing  angles:As the centre for the poing,Swing to right and left with angle of 175°,total 350°;the angle could be adjustable within this range.

9.Working noise:75db(The value got at the point with 1 meter away from the front site of the machine and 1.2 height from the ground.)

10.Power supply information

1)AC 220V single phase RN+ protective grounding;voltage fluctuation range 10%

2)Frequency fluctuation range:50±0.5HZ;

3)Power supply method:TN-S or TT method

4)Grounding resistance of protection ground wire

5)User should equip with relevant capacity air switch or dynamic switch on the installation site,and the switch must control this machine only.When the electrified test sample is put in the test chamber,the power of the test sample should be connected with extra power,don’t use the power of this machine;

 

You May Like